** Please be advised, the Soil Declaration Form must be completed before materials can be accepted. This soil declaration form will be valid for three months from the date of approval.

VIC - ESG Deer Park - Middle Rd

Intersection of Christies Rd & Middle Rd, DEER PARK, VIC 3023

Complete Soil Declaration Form
Thu 21 Nov
Open
Hours: 7:00-16:00
Fri 22 Nov
Open
Hours: 7:00-16:00
Sat 23 Nov
Open
Hours: 7:00-13:00
Sun 24 Nov
Closed
Hours: -
Mon 25 Nov
Open
Hours: 7:00-16:00
Tue 26 Nov
Open
Hours: 7:00-16:00
Wed 27 Nov
Open
Hours: 7:00-16:00

VIC - ESG Deer Park...


Channel 38
The UHF channel is posted on signs when you enter the site.

ENTRY REQUIREMENTS
• Flashing light clearly visible from all sides, must be on at all times whilst onsite
• All trucks must be fitted with operational reversing beeper
• Equipment must be serviced and maintained to manufacturers requirements
• Pre-start checklist must be completed each morning to ensure equipment is safe to operate
• Equipment must be fitted with operational UHF Radio and turned on
• Trucks are to carry valid fire extinguisher
• PPE – Long Sleeve Shirt, HI Vis Vest/top, Long Pants, Steel Capped Boots

Prior to visiting this site, please ensure you have received your ESG job number by completing a Soil Declaration Form for every project location, which expire 3 months after approval.

ESG Deer Park accept Level 1 Clean compactable fill material only (clays and mudstones ONLY) No topsoil, grass or rocks. We cannot accept inert waste, e.g. bricks, concrete, metal, asphalt, asbestos, rubbish, contaminated fill or garden waste.

Material fill type will be assessed upon arrival at the gate house and a minimum charge of 6 m3 per load will incur.

If you don‘t have a credit card registered with us, please ensure you bring a valid credit card to the gate.

If you are interested in opening an account, please contact Accounts on 1300 TIP ESG (847 374) option 3.

We look forward to seeing you soon!

Location info


Fill Types

Prices

Dry Fill

$9 /per m3 +GST

Wet Fill

$11 /per m3 +GST

Please note:
  • All prices are subject to change
  • ESG have a minimum 6 LCM charge per load
  • All material is subject to site review and approval, if material is classified as anything other than dry fill you will be notified by email and the applicable charges will be applied.

Please be advised, the Soil Declaration Form must be completed before materials can be accepted.

Complete Soil Declaration Form

**This soil declaration form will be valid until three months after approval.

Complete Soil Declaration Form