** Please be advised, the Soil Declaration Form must be completed before materials can be accepted. This soil declaration form will be valid for three months from the date of approval.

VIC - ESG Waurn Ponds

Corner Princes Hwy & Anglesea Rd, Waurn Ponds, VIC 3216

Complete Soil Declaration Form
Sun 6 Oct
Closed
Hours: -
Mon 7 Oct
Open
Hours: 7:00-16:00
Tue 8 Oct
Open
Hours: 7:00-16:00
Wed 9 Oct
Open
Hours: 7:00-16:00
Thu 10 Oct
Open
Hours: 7:00-16:00
Fri 11 Oct
Closed
Hours: 7:00-13:00
Sat 12 Oct
Closed
Hours: -

VIC - ESG Waurn Ponds


Channel 38
The UHF channel is posted on signs when you enter the site.

ENTRY REQUIREMENTS
• Flashing light clearly visible from all sides, must be on at all times whilst onsite
• All trucks must be fitted with operational reversing beeper
• Equipment must be serviced and maintained to manufacturers requirements
• Pre-start checklist must be completed each morning to ensure equipment is safe to operate
• Equipment must be fitted with operational UHF Radio and turned on
• Trucks are to carry valid fire extinguisher
• PPE – Long Sleeve Shirt, HI Vis Vest/top, Long Pants, Steel Capped Boots

Prior to visiting this site, please ensure you have received your ESG job number by completing a Soil Declaration Form for every project location, which expire 3 months after approval.

We accept Clean Fill material only, we cannot accept inert waste, e.g. bricks, concrete, metal, asphalt, asbestos, rubbish, contaminated fill or garden waste.

Material fill type will be assessed upon arrival at the gate house and a minimum charge of 6 m3 per load will incur.

If you don‘t have a credit card registered with us, please ensure you bring a valid credit card to the gate.

If you are interested in opening an account, please contact Accounts on 1300 TIP ESG (847 374) option 3.

We look forward to seeing you soon!

Location info


Fill Types

Prices

Dry Fill

$8.5 /per m3 +GST

Wet Fill

$12 /per m3 +GST

Grassy Fill

$12 /per m3 +GST

Rocky Fill

$12 /per m3 +GST

Slop

$24 /per m3 +GST

Please note:
  • All prices are subject to change
  • ESG have a minimum 6 LCM charge per load
  • All material is subject to site review and approval, if material is classified as anything other than dry fill you will be notified by email and the applicable charges will be applied.

Please be advised, the Soil Declaration Form must be completed before materials can be accepted.

Complete Soil Declaration Form

**This soil declaration form will be valid until three months after approval.

Complete Soil Declaration Form